
The soil testing work for the proposed Namma Metro Red Line being carried out on Sarjapur road in Bengaluru on Wednesday. | Photo Credit: SPECIAL ARRANGEMENT
The Bangalore Metro Rail Corporation Limited (BMRCL) has begun geotechnical investigations along Sarjapur Road for the proposed 37.8-km Bengaluru Metro Phase 3A corridor, also known as the Red Line, which is planned to connect Sarjapur in southeast Bengaluru with Hebbal in the north.
The investigation will assess the characteristics of the soil and underlying rock formations along the proposed alignment before construction work begins. The findings will help engineers evaluate ground conditions and determine the technical requirements for building the elevated and underground sections of the metro corridor, according to the BMRCL officials.
Namma Metro Phase 3A (Red Line): Key Details
Route: Hebbal to Sarjapur Road
Route Length: 37.8 km
Route Composition: 23 km elevated and 14 km underground
Major Areas Covered: Hebbal, Central Business District, Koramangala, Sarjapur
Latest Estimated Cost: ₹25,999 crore
Speaking to The Hindu, a senior BMRCL official said, “The study will provide essential information about soil stability, geological formations and other ground conditions along the route. These findings will guide decisions on foundation depth, structural design and the construction requirements for metro pillars, helping ensure the safety and stability of the infrastructure.”







Comments
0 commentsNo comments yet — be the first.