Politics

Bailey bridge at Betrawati restores road connectivity with Rasuwa

Bailey bridge at Betrawati restores road connectivity with Rasuwa
Photo credit: The Rising Nepal
Advertisement

Trishuli (Nuwakot), Oct 11: The road connectivity with Rasuwa district, which was disrupted since August 26 Bhotekoshi flood, has been restored with the installation of a bailey bridge on Sunday.

The pre-fabricated truss bridge was fixed by the Nepali Army at Betrawati. It has established the road connection from Nuwakot to Rasuwa, thereby easing transportation activities. 

The devastating flood occurred in Bhotekoshi-Trishuli rivers had washed away two motorable bridges- at Bidur Municipality-10) and at Uttargaya Rural Municipality-5.

Advertisement
Advertisement
Originally published by The Rising Nepal on Oct 11, 2026 Read the full article at risingnepaldaily.com
Read original
About this page. Sisnoo is an aggregator. This article was imported from a publisher feed and may have been reformatted. Copyright remains with the original publisher, and the headline, image and any quoted text are used for attribution and indexing purposes. Source links are preserved on every item in the archive.
Share

Comments

0 comments

No comments yet — be the first.

Advertisement

More from The Rising Nepal

View source
The Rising NepalThe Rising Nepal Staff

Seeds sown for jamara

Kathmandu, Oct 11: The Hindu Nepalis have sown the seeds for growing jamara, holy seedlings, at Dashainghar or puja cham...

2 hours ago1

Related

The Rising NepalThe Rising Nepal Staff

Seeds sown for jamara

Kathmandu, Oct 11: The Hindu Nepalis have sown the seeds for growing jamara, holy seedlings, at Dashainghar or puja cham...

2 hours ago1