International

Hyderabad KBR project: Elevated corridor work divided to fit into previous two packages

Hyderabad KBR project: Elevated corridor work divided to fit into previous two packages
Photo credit: The Hindu
Advertisement
The single elevated corridor, around KBR Park, from Jubilee Hills Checkpost to NFCL Junction in Hyderabad is divided into two parts. File
Photo credit: The Hindu

The single elevated corridor, around KBR Park, from Jubilee Hills Checkpost to NFCL Junction in Hyderabad is divided into two parts. File | Photo Credit: NAGARA GOPAL

The Telangana government has divided the single elevated corridor work from Jubilee Hills Checkpost to NFCL Junction, Hyderabad, into two parts to adjust it into the two packages of the hitherto cancelled components, previously approved, tendered and awarded.

Flyover and underpass works at TV9 junction and NFCL Junction cancelled

The orders issued by the Metropolitan Area and Urban Development department on Tuesday (October 7, 2026) approved the proposal by the Commissioner, Greater Hyderabad Municipal Corporation (GHMC), to revise the scope of the infrastructural components, and cancelled the previously approved flyover and underpass works at TV9 junction and NFCL Junction.

Advertisement

Jubilee Hills Check Post Junction-Muffakham Jah College continuous corridor

Advertisement
Originally published by The Hindu on Oct 7, 2026 Read the full article at thehindu.com
Read original
About this page. Sisnoo is an aggregator. This article was imported from a publisher feed and may have been reformatted. Copyright remains with the original publisher, and the headline, image and any quoted text are used for attribution and indexing purposes. Source links are preserved on every item in the archive.
Share

Comments

0 comments

No comments yet — be the first.

Advertisement

More from The Hindu

View source

Related